At the end of your show, the studio sends a delivery checklist: every master, audio package, subtitle file and document it needs, one line per work order. Here's how to read it.
Every show's list is different. What follows is typical; your Delivery Manager confirms per show. The specs themselves are in the Global Production Manual (GPM).
How do I read a delivery checklist?
Each row is one work order in the delivery portal. The columns tell you:
- Work Order Name and Asset Spec: what to deliver, for example a texted UHD HDR master or a full subtitle file. Look up the spec in the GPM.
- Asset Type: the family it belongs to (see the next question).
- Status: where the work order is, for example Created.
- Language: the language of that version.
- Due Date: when it's due.
- Vendor: who delivers it. Some rows say Amazon: the studio fulfils those itself.
- Version and Edit: for example V1 and Original Edit.
- Distribution Profile: where the asset is going, mostly for screeners.
- Completion Date and Verified Date: filled in as the work order moves on.
- Filename: the exact name to use. Follow it, and the GPM naming convention.
Still not working? Not sure what a row means? Ask your Delivery Manager.
What kinds of assets are on the list?
- Video: the masters, for example texted UHD HDR and SDR.
- Audio: the audio package.
- Accessibility: audio description and subtitles for the deaf and hard of hearing (SDH).
- Documentation: scripts, the cast list, the change list, the lower-thirds spotting list and more.
- DCP: the cinema package and its key message (DKDM).
- Screener, Metadata (for example the HDR report), QC Report and Archival.
Still not working? Ask your Delivery Manager which ones apply to you.
In what order do things get delivered?
A typical order:
- First: the UHD HDR texted master (HDR10, Volume Access & Permissions and 2.0, ProRes 4444 XQ) with its HDR metadata report. At the same time: the scripts, lower-thirds spotting list, cast list, English creative subtitles and, if the cut changed, the change list.
- Then, once HDR passes QC: the SDR texted master.
- Then, once the masters are approved: the audio package (printmasters, sessions, M&E and stems). If the M&E fails, the whole audio package is delivered again.
- Alongside audio QC: textless reels and accessibility files. Audio description comes as a .mov first, then the separate .wav tracks.
- DCP: a 4K flat package for the cinema QC, with a key message (DKDM) valid for five years. Your Delivery Manager sends the certificates.
Wait for HDR approval before you deliver more. Typical QC turnaround: 48 business hours for streaming masters (rush: 24 hours), 72 for audio.
Still not working? Dates shifting with QC fixes? That's normal. Check with your Delivery Manager.
Where does each thing go?
Everything goes through the delivery portal (Source Plan), against its work order:
- Streaming assets, including work-in-progress versions for QC → the QC vendor.
- Audio package → the audio QC vendor.
- Documents in two steps: temporary versions to Box, finals to the portal.
- Archival assets → Amazon, only after the streaming masters pass QC.
See Delivering to the Studio for how to upload.
Still not working? Not sure where a file goes? Ask your Delivery Manager.
What does Amazon deliver itself?
- Camera files (original capture files): they're already in the archive, so you don't upload them again.
- Screeners: the studio makes them for the distribution profile on the list.
Still not working? See S3 Backup & Archive.
Where do I find the change list and lower-thirds templates?
- Both templates are on the GPM. Use the GPM version, not an old copy.
- Change list: what changed between cuts: old and new timecodes, a description, the running-time change, and whether dialogue, on-screen text or music is affected.
- Lower-thirds spotting list: every piece of on-screen text, with timecodes, text type, language, font, the original text and its English translation.
Still not working? Ask your Post Exec or Delivery Manager for the current template.
Still stuck? We've got you
Your Amazon Post Exec or vendor manager is often the fastest way out: they know your show.
| If it's… | Contact | When |
|---|---|---|
| Signing in: password, Okta, MFA, a new phone, locked out, or access to Box, Flow Capture or Aspera on Cloud | TechOps · support@amazonstudios.com | 24/7 |
| Anything else in the cloud: workstations, Avid, Resolve, Nexis, transfers, storage, set-up | Production Technology · post-support@amazonstudios.com | Mon-Fri · 6 AM-2 AM UK (10 PM-6 PM Pacific) |
| An outage: your Lot One production is down | Emergency contact form → · choose Cloud Production Technology Support, set Request Type to Outage and Severity to 2 | 24/7 |
Get help faster: send your name and show, the machine name, the exact error (a screenshot is perfect) and what you've already tried. One email per problem.